摘要 导流隧洞的封堵施工是水利枢纽工程下闸蓄水后需立即实施的最后一个关键施工项目,其封堵的成功与否及效果好坏直接关系到水电站坝前库区的蓄水速度及厂房机组的发电出力大小。长潭河水利水电枢纽工程导流隧洞永久混凝土堵头在洞内渗水严重、岩体较差等特殊地质条件下成功实施封堵并达到了预期效果,取得了良好的经济效益和社会效益。 Plugging Technology for diversion tunnel is the last key construction projects need to be immediately implemented after water storage in the water hydro-junction project.The plugging result is directly related to the power station dam reservoir water storage rate and plant power output size.In Changtan River hydro-junction project,the diversion tunnel is plugged successfully under the special geological conditions of bad rock strength and severe water leakage in the tunnel which gain good social benefit and economic benefit.
出处 《施工技术》 CAS 北大核心 2013年第12期48-50,共3页 Construction Technology
关键词 隧洞 渗漏 排水 封堵 tunnels leakage drainage plugging
  • 相关文献

参考文献6

二级参考文献11

  • 1DI/T 5148-2001水工建筑物水泥灌浆施工技术规范[S].
  • 2康世荣,等.水利水电工程施工组织设计手册[M].北京:中国水利水电出版社,2001.
  • 3中水顾问集团成勘院.金沙江溪洛渡水电站导流洞灌浆和排水孔施工技术要求[R].成都:中水顾问集团成勘院,2005.
  • 4夏可风,吴晓铭,朱彤,等.水利水电工程施工手册*地基与基础工程[M].北京:中国电力出版社,2004.
  • 5张良秀.化学灌浆技术的新发展和应用情况[M].北京:中国电力出版社,1998.
  • 6长江水利委员会长江科学院.CW系化学灌浆材料研究与应用[R].2002.
  • 7SL279-2002.水工隧洞设计规范[S].[S].,..
  • 8DL/T5148-2001.水工建筑物水泥灌浆施工技术规范[S].[S].,..
  • 9DL/T 5195-2004,水工隧洞设计规范[S].
  • 10陈振华,刘金清,游梦雄,李祖德.大坝汛期下闸蓄水时的导流洞封堵施工[J].水利科技,2009(2):43-44. 被引量:6