董箐水电站发电机组采用了许多新技术和工艺,介绍了发电机组主要部件的安装流程和主要工艺。通过控制关键工序,大大缩短了总装时间。在整个安装过程中严格按照规程规范和国标进行控制,整个安装质量优良。
Dongjing Hydropower Station uses new installation technology.This paper introduces installation sequence and installation technology of the main members of the generating set.By controlling the key construction process,the installation time is shortened.In installation,the generating set is constructed by codes and standards to guarantee the whole installation quality.
出处
《施工技术》
CAS
北大核心
2013年第12期86-89,共4页
Construction Technology
关键词
水电站
发电机
安装
hydroelectric power stations
generator
installation