摘要 响水涧抽水蓄能电站施工完毕正常运行过程中,由于操作人员操作不当,发生了水淹厂房的紧急情况。水压力高,水量大,如不及时排除险情,将导致全厂电力中断。详细介绍了抢险方案的制定以及抢险施工。通过科学的抢险方案,险情得到了及时处理。 When the Xiangshuijian Pumped Storage Power Station is running,because of wrong operation,the plant is flooded with water.Because of high water pressure and large water quantity,the whole electric power would be break off if the emergency condition is solved.This paper introduces in detail determination of emergency plan and construction.By scientific emergency plan,the emergency condition was treated successfully.
出处 《施工技术》 CAS 北大核心 2013年第12期99-100,共2页 Construction Technology
关键词 水电站 抢险 施工技术 hydroelectric power stations emergency handling construction
  • 相关文献

参考文献5

  • 1李伟,于文江,沈志松.抽水蓄能电站输水系统施工技术[M].北京:中国电力出版社,2007:2-5.
  • 2邱彬如,刘连希.抽水蓄能电站工程[M].北京:中国电力出版社,2008.
  • 3张健,郑源.抽水蓄能技术[M].南京:河海大学出版社,2011.
  • 4高传昌,汪顺生.抽水蓄能电站技术[M].郑州:黄河水利出版社,2011.
  • 5张利荣,刘祥恒.基于突发事件爆发时间特性的应急救援策略研究[J].水利水电技术,2011,42(9):16-19. 被引量:23

二级参考文献6

共引文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部