摘要
响水涧抽水蓄能电站施工完毕正常运行过程中,由于操作人员操作不当,发生了水淹厂房的紧急情况。水压力高,水量大,如不及时排除险情,将导致全厂电力中断。详细介绍了抢险方案的制定以及抢险施工。通过科学的抢险方案,险情得到了及时处理。
When the Xiangshuijian Pumped Storage Power Station is running,because of wrong operation,the plant is flooded with water.Because of high water pressure and large water quantity,the whole electric power would be break off if the emergency condition is solved.This paper introduces in detail determination of emergency plan and construction.By scientific emergency plan,the emergency condition was treated successfully.
出处
《施工技术》
CAS
北大核心
2013年第12期99-100,共2页
Construction Technology
关键词
水电站
抢险
施工技术
hydroelectric power stations
emergency handling
construction