期刊文献+

火电厂脱硫增容改造系统优化 被引量:2

Optimizations of Rehabilitations for Wet Flue Gas Desulfurization Systems of Thermal Power Plants
下载PDF
导出
摘要 随着电厂燃煤含硫增加以及国家对火电厂大气污染物排放标准更为严格,电厂早期所上的脱硫装置已经很难适应煤种变化及新标准的要求。火电厂脱硫增容改造迫在眉睫。该文论述了电厂脱硫各系统增容改造、部分测量仪表优化以及运行中药剂的添加。 The FGD devices of thermal power plants were difficuk to adapt as the sulphur content in coal increasing and the standards for the discharge of atmospheric pollutants tightened. Therefore, rehabilitation for wet flue gas desulfu- rization system was extremely urgent. Rehabilitation for wet flue gas desulfurization subsystems, optimizations of some measuring instruments and additives' supplying during service were discussed.
出处 《广州化工》 CAS 2013年第12期203-205,共3页 GuangZhou Chemical Industry
关键词 湿法烟气脱硫 脱硫增容改造 塔密度测量 消泡剂 脱硫添加剂 wet flue gas desulfurization rehabilitation density measurements defoaming agents desulfurization additives
  • 相关文献

参考文献5

二级参考文献15

共引文献27

同被引文献9

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部