摘要 浮式LNG接收终端由供LNG运输船和浮式气化装置(FSRU)停靠作业的泊位、工作船泊位、LNG储罐和输气管线系统等组成,国外已有多个成功建设的先例,天津港南疆港区浮式LNG项目是国内首座浮式LNG接收终端。浮式LNG接收终端与常规的LNG储运设施相比技术更加成熟、安全性更有保障、灵活性更高、建设工期也更短,简要总结天津港南疆浮式LNG项目码头工程的设计要点,可供同类工程参考与借鉴。 The floating LNG terminal consists of the berth for LNG vessel and the floating storage & regasification unit(FSRU), the work-boat berth, LNG storage tanks and natural gas conveying pipelines. Dozens of floating LNG terminals have been successfully constructed overseas. As the first floating LNG terminal in China, Tianjin Port Nanjiang Harbor floating LNG terminal project is of the advantages of mature technique, reliability, high adaptability and short construction period in comparison with conventional LNG storage facilities. Now we briefly summarize the design characteristics of Tianjin Port Nanjiang Harbor floating LNG terminal project, which will provide references for similar projects.
出处 《港工技术》 2013年第1期9-12,共4页 Port Engineering Technology
关键词 天津港 南疆港区 液化天然气 浮式气化装置 总平面布置 拖轮配置 Tianjin Port Nanjiang Harbor LNG(liquefied natural gas) floating storage & re-gasification unit(FSRU) general layout tugboat arrangement
  • 相关文献

参考文献6

  • 1JTSl65-5-2009液化天然气码头设计规范[S].北京:人民交通出版社.2000.
  • 2中交第一航务工程勘察设计院有限公司.中海油天津浮式LNG接收终端项目港口码头及航道工程可行性研究报告[R].天津:中交第一航务工程勘察设计院有限公司,2012.
  • 3JTS95--2000开敞式码头设计与施工技术规程[S].北京:人民交通出版社.2000.
  • 4OCIMF. Mooring Equipment Guidelines [M]. 3rd Edition. London: Witherby & Co. Ltd., 2007.
  • 5杨兴晏.中海油天津浮式LNG接收终端项目港口码头及航道工程系泊系统分析专题报告[R].天津:中交第一航务工程勘察设计院有限公司.2012.
  • 6Hensen C H. Tug Use in Port: a Practical Guide [M].2nd Edition. IS.1.]: The Nautical Institute, 2003.

同被引文献35

  • 1柴长清.进口液化天然气(LNG)码头建设中的几个问题[J].中国港湾建设,2004,24(4):5-8. 被引量:10
  • 2刘远传,万德成.锚泊浮式码头在波浪上的运动响应计算[C].第二十五届全国水动力学研讨会暨第十二届全国水动力学学术会议,舟山,浙江,中国,2013.
  • 3HUANG S. Dynamic analysis of three-dimensional ma- rine cables[J]. Ocean Engineering, 1994, 21(6): 587- 605.
  • 4BROWN D T, MAVRAKOS S. Comparative study on mooring line dynamic loading[J]. Marine Structures, 1999, 12(3): 131-151.
  • 5SHEN Z R, CAO H J, WAN D C. The manual of CFD solver for ship and ocean engineering flows: naoe- FOAM-SJTU[J]. Journal of Shanghai Jiao Tong Univer- sity, 2012.
  • 6SHEN Z R, WAN D C. RANS computation of added re- sistance and motions of a ship in head waves[J]. Journal of Offshore and Polar Engineering, 2013, 23(4): 263- 271.
  • 7CAO H J, WAN D C. Development of multidirectional nonlinear numerical wave tank by naoe-FOAM-SJTU solver[J]. International Journal of Ocean System Engi- neering, 2014, 4(1): 52-59.
  • 8丁春香,金芳.我国LNG产业发展的现状、问题及对策[J].天然气技术,2008,2(5):13-15. 被引量:5
  • 9马娟,万德成.典型标准水面船型阻力和黏性流场的计算[J].中国科学:物理学、力学、天文学,2011,41(2):178-193. 被引量:7
  • 10查晶晶,万德成.用OpenFOAM实现数值水池造波和消波[J].海洋工程,2011,29(3):1-12. 被引量:36