境外某电厂码头防波堤破损部分的修复 被引量:4

Renovation of Damaged Breakwater of Overseas Power Plant Terminal
下载PDF
导出
摘要 2007年建成的境外某电厂码头防波堤多次遭到破坏并已出现缺口,致使港内码头无法正常作业,并进一步危及基础设施的安全,2010年由中国承包商对该防波堤的破坏部分进行紧急修复和整治。结合本工程所处海域的波浪、潮流等复杂水动力条件和泥沙运动活跃的自然条件,重点分析导致防波堤破坏的原因,在现场调研和相关模型试验研究论证的基础上,提出合理可行的防波堤修复方案。截止2011年底防波堤缺口修复工作已基本完成,整治效果良好。 An overseas power plant terminal was constructed completely in 2007. Since the breakwater that shields the power plant terminal was damaged time after time, the fissures of breakwater influenced the normal operation of the terminal. Furthermore, it endangered the relevant infrastructure. In 2010, one Chinese contractor started to renovate and regulate the damaged breakwater. Based on wave, tide and other complicated hydrodynamic conditions as well as active sediment movement within the engineering sea area, the cause for breakwater damage was analyzed in detail. In accordance with field investigation, research and argumentation of relevant model test, a feasible breakwater renovating plan was put forward. By the end of 2011, the renovation work was almost completed and a good effect was gained in practice.
出处 《港工技术》 2013年第1期32-36,共5页 Port Engineering Technology
关键词 电厂码头 防波堤 修复 整治 “双联型”消浪块体 power plant terminal breakwater renovation regulating work dual wave-dissipating blocks
  • 相关文献

参考文献4

  • 1JTS154-1-2011防波堤设计与施工规范[S].北京:人民交通出版社.2011.
  • 2交通部天津水运工程科学研究所.境外某电厂防波堤紧急修复工程岸滩稳定与泥沙冲淤现状分析报告[R].天津:交通部天津水运工程科学研究所.2010.
  • 3交通部天津水运工程科学研究所.境外某电厂防波堤紧急修复工程波浪断面物理模型试验报告[R].天津:交通部天津水运工程科学研究所.2010.
  • 4王美茹,谢善文,郭科,等.新型消浪块体的开发与研究//土木工程与高新技术:中国土木工程学会第十届年会论文集[C].北京:中国土木工程学会,2002.

共引文献4

同被引文献19

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部