期刊文献+

横向受载超长PHC管桩计算方法 被引量:1

Calculation method of laterally loaded super-long PHC pile
下载PDF
导出
摘要 通过对p-y曲线的主要影响因素进行分析,结合现场试桩资料,以规范推荐的p-y曲线计算方法为基础,选取合适的土的特性参数与强度指标,建立新的p-y曲线法,并与m法、NL法、规范p-y曲线法进行比较,结果表明桩身最大弯矩的计算值都与实测值比较接近,但桩顶位移各种算法相差很大,按新的p-y曲线法的计算值与实测值吻合程度最好。 Based on the analysis of main influential factors ofp-y curve and a project field testing result and according to the calculation method suggested in the code ,this paper selects suitable characteristic parameters and strength index of soft clay and establishes a newp-y curve method and compares with calculation results of m-method, NL-method and standard p-y curve method. The results show that the calculated value and measured value of the maximum bending movement of pile integrity are close to each other, but there are significant differences among different calculation methods and the calculated value of the suggested p-y curve is the best one to fit the measured value.
出处 《水运工程》 北大核心 2013年第6期155-160,共6页 Port & Waterway Engineering
关键词 超长PHC管桩 水平承载力 P-Y曲线 抗剪强度 极限土抗力 super-long PHC pile horizontal bearing capacity p-y curve shear strength ultimate soil resistance
  • 相关文献

参考文献3

二级参考文献1

  • 1王惠初,鲁子爱.用P-Y曲线计算横向荷载桩的内力[J]重庆交通学院学报,1985(01).

共引文献99

同被引文献6

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部