摘要 By integrating literature reviews, site observa- tion, field monitoring, theoretical analysis, summarization, etc., a construction strategy was proposed and verified for tunneling with big deformation in this paper. The tunnel was in phyllite, shotcrete cracks and steel arch distortion were observed, and a big deformation with a maximum of 2.0 m was monitored during the initial stage of the construction. Through carefully examining the site observation and laboratory test results, a construction principle was established for the tunneling on the basic concept of maintaining the rock strength/stiffness and keeping the rock dry, by providing confinement pressure to the rock, reducing the rock exposure time, keeping water out of the tunnel, etc. To achieve the construction principle, a set of specific construction measures with 11 items was further proposed and applied to the construction. To check the effectiveness of the construction measures, field monitoring was carried out, which showed that the rock deformation was well controlled and the tunnel became stable. An allowable deformation was then determined using the Fenner formulae and the monitored data in order to guide further construction, which received a good result. From this study, it can be concluded that providing quick strong initial support and reserving core soil at the working faceare extremely important to control the rock deformation and keep the tunnel stable. By integrating literature reviews, site observa- tion, field monitoring, theoretical analysis, summarization, etc., a construction strategy was proposed and verified for tunneling with big deformation in this paper. The tunnel was in phyllite, shotcrete cracks and steel arch distortion were observed, and a big deformation with a maximum of 2.0 m was monitored during the initial stage of the construction. Through carefully examining the site observation and laboratory test results, a construction principle was established for the tunneling on the basic concept of maintaining the rock strength/stiffness and keeping the rock dry, by providing confinement pressure to the rock, reducing the rock exposure time, keeping water out of the tunnel, etc. To achieve the construction principle, a set of specific construction measures with 11 items was further proposed and applied to the construction. To check the effectiveness of the construction measures, field monitoring was carried out, which showed that the rock deformation was well controlled and the tunnel became stable. An allowable deformation was then determined using the Fenner formulae and the monitored data in order to guide further construction, which received a good result. From this study, it can be concluded that providing quick strong initial support and reserving core soil at the working faceare extremely important to control the rock deformation and keep the tunnel stable.
出处 《Journal of Modern Transportation》 2013年第2期86-94,共9页 现代交通学报(英文版)
关键词 Tunnel engineering Big deformation Construction strategy Tunnel engineering Big deformation Construction strategy
  • 相关文献

参考文献3

二级参考文献18

  • 1姜云,李永林,李天斌,王兰生.隧道工程围岩大变形类型与机制研究[J].地质灾害与环境保护,2004,15(4):46-51. 被引量:94
  • 2.《隧道》铁路工程设计手册 [S].,1999..
  • 3.公路隧道施工技术规范(JTJ042-94) [S].北京:人民交通出版社,..
  • 4姜云 王兰生.隧道工程围岩大变形问题研究[C]..2003年全国公路隧道学术会议论文集[C].北京:人民交通出版社,2003.15-22.
  • 5翁汉民 李永林.高地应力条件下隧道大变形破坏机理的研究及其在二郎山隧道工程中的应用(研究报告)[R].,1999—10..
  • 6S.G. Chen,,Y. Zhao,,H. Zhang.Analysis of large rock de- formation under high in situ stress. Proceedings of 9th International Conference On Analysis Of Discon- tinuous Deformation . 2009
  • 7S.G. Chen,,H. Zhang,,C.P. Yan,et al.The construction of the Jinping Auxiliary Tunnel in Karst rock. ISRM Regional Symposium EUROCK 2009,Rock Engineering in Difficult Ground Conditions-Soft Rocks and Karst . 2009
  • 8Chinese Railway 2nd Engineering Corporation Ltd.The construction technology of deep overburdened long tun- nel in high pressure and rock water strata. . 2008
  • 9J. Zhang,S. Ren,H. Jiang,et al.A study on major engi- neering geological issues for Jinping traffic tunnel. Ad- vances in Science and Technology of Water Resources . 2006
  • 10C.P. Yan,,J.S. Yang,,S.G. Chen.An integrated geologi- cal prediction technology and its application at Fault F6 of Jinping traffic tunnel. Highway Tunnel . 2008

共引文献48

同被引文献22

引证文献1

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部