锰冶炼厂总图运输设计体会

Analysis of Manganese Smelter General Layout Design
下载PDF
导出
摘要 通过对汇元锰业冶炼厂总图运输设计实例的分析,阐述了城市规划、生产工艺、外部运输条件、风向、建筑物朝向、近期建设、远期发展、厂区绿化等因素对厂区总体布置的影响,总结了锰冶炼厂总平面设计经验,可为类似企业设计提供借鉴。 Through the analysis on the practice of Hui -Yuan manganese smelter project general layout design, the influences of city planning, production process, external transport conditions, wind direction, direction of building, recent construction, the long - term development, factory greening and other factors on the general layout of the plant are stated, and the design experience of Hui - Yuan manganese smelter project general layout is summarized, it is to be the reference for similar smelters design.
作者 李立
出处 《铜业工程》 CAS 2013年第3期38-40,68,共4页 Copper Engineering
关键词 锰冶炼厂 城市规划 生产工艺 工厂运输 总体布置 : manganese smelter city planning production process factory transport general layout
  • 相关文献

参考文献3

  • 1GB50187-2012.工业企业总平面没计规范[S].
  • 2井生瑞.总图设计[M].北京冶金工业出版社,1992:43-45.
  • 3GB50049-2011小型火力发电厂设计规范[S].

共引文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部