牛栏江-滇池补水工程进度控制与质量安全管理 被引量:1

Progress control and quality safety management of Niulan River-Dianchi Lake Water Supplement Project
下载PDF
导出
摘要 云南省牛栏江-滇池补水工程是滇池治理六大措施中的关键工程,工程建设周期短、工期压力较大、建设任务繁重,工程进度控制与质量安全管理的矛盾极为突出。介绍了工程建设管理过程中,在设计技术管理,项目咨询和评审,招投标,合同管理,质量安全管理以及监理管理等方面的成功经验,提出了在水利工程建设管理中解决进度控制与质量安全管理矛盾的具体做法。对进度控制与质量安全管理之间的同步推进作了有益尝试。 Niulan River - Dianchi Lake Water Supplement Project is the key project of the six measures in Dianchi Lake har- nessing projects, challenged by short construction period and heavy construction task, the contradiction between progress control and quality safety management is prominent. The successful experiences in technical management of design, project consulting and evaluation, biding, contract management, quality safety management and supervision management during the construction process of the project is introduced. The solution for the contradiction between progress control and quality safety management is proposed, which is helpful for promoting progress control and quality safety management.
出处 《人民长江》 北大核心 2013年第12期102-105,共4页 Yangtze River
关键词 建设管理 进度控制 质量管理 安全管理 牛栏江-滇池补水工程 construction management progress control quality management safety management Niulan River-Dianchi Lake Water Supplement Project
  • 相关文献

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部