期刊文献+

八一井砌碹巷道修复加固方案的优化及实践 被引量:1

Optimization and practice of the scheme of restoration and reinforcement of the junction arch-lining in Bayi Coal Mine
下载PDF
导出
摘要 为保障八一井的正常安全生产,需要对八一井运输大巷和车场绕道进行修复加固.通过观测巷道围岩变形,分析巷道碹体破坏情况和围岩失稳机理.提出了2种支护方案:一是"U"型钢架棚支护;二是锚、网、喷和锚索联合支护.对2种支护方案进行技术经济对比,得到本工程采用方案二,可以取得更为优越的技术经济效果.工程实践表明锚、网、喷和锚索联合支护技术能有效的改善围岩受力状况,具有良好的支护效果,既降低成本又缩短工期. In order to ensure the security of Bayi Coal of the transport alleys and yard bypass need to be repaired Mine' s regular production, the damaged surrounding rocks and reinforced. By observing the deformation of surrounding rock, this paper analyzes the roadway building blocks damage supporting schemes are proposed, i.e. the first scheme is U - and instability mechanism of surrounding rock. Two shaped steel frame shed support method, and the second scheme is the combined support with anchor, net, spray and anchor cable. By comparing the two kinds of supporting schemes in technology and economy, we can draw the conclusion that the second scheme is better for us to achieve technical and economic effects. Engineering practice shows that the combined support with anchor, net, spray and anchor cable can improve the force condition of the surrounding rocks effectively, achieve good supporting effects, shorten engineering time and reduce the cost of engineering.
出处 《矿业工程研究》 2013年第2期16-19,共4页 Mineral Engineering Research
基金 湖南科技大学研究生创新基金资助项目(S120003)
关键词 砌碹巷道 支护方案 优化 工程效果 the junction arch - lining support plan optimization effect of engineering
  • 相关文献

参考文献7

二级参考文献21

共引文献48

同被引文献8

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部