Improvements of drilling fluid processing for cable-suspended electromechanical drills

Improvements of drilling fluid processing for cable-suspended electromechanical drills
下载PDF
导出
摘要 Deep ice drilling in Polar Regions plays a key role in paleo-climate, microbiological and glaciological researches. For deep ice and subglacial coring the special purpose-built electromechanical cable-suspended drills with bottom-hole circulation are designed and explored. Used at present drilling fluid circulation systems are specified by very high fluid wastes during processing. Measurements in deep drilling projects in Antarctic and Greenland ice sheets showed that 25%-40% of the drilling fluid, pumped into the hole, is retrieved to the surface with cable and drill, and up to 45% of retrieved fluid goes to waste. This leads not only to increasing of the fluid consumption and cost of the project in general but also to severe contamination of air, surface and near-surface snow-firn layers at the drilling site. In order to reduce wastes and environmental impact, it is proposed to modify drilling fluid processing system by avoiding of evaporation and leakages of fluid as far as practicable. Drilling fluid is prepared and pumped into the hole according to predetermined program on semiautomatic mode, and volume and density of blended and pumped into the hole drilling fluid are measured continuously. Components of the drilling fluid are stored and mixed in the special closed containers equipped by pressure relief valves. Separation of drilling fluid from ice cuttings is carried out by two steps: firstly, fluid is separated with hydro extractor and then with thermal separator. To reduce the amount of removed drilling fluid with cable special squeezing collar is installed on the borehole mouth. All these arrangements are able to decrease drilling fluid wastes in many times. Deep ice drilling in Polar Regions plays a key role in paleo-climate, microbiological and glaciological researches. For deep ice and subglacial coring the special purpose-built electromechanical cable-suspended drills with bottom-hole circulation are designed and explored. Used at present drilling fluid circulation systems are specified by very high fluid wastes during processing. Measurements in deep drilling projects in Antarctic and Greenland ice sheets showed that 25%-40% of the drilling fluid, pumped into the hole, is retrieved to the surface with cable and drill, and up to 45 % of retrieved fluid goes to waste. This leads not only to increasing of the fluid consumption and cost of the project in general but also to severe contamination of air, surface and near- surface snow-firn layers at the drilling site. In order to reduce wastes and environmental impact, it is proposed to modify drilling fluid processing system by avoiding of evaporation and leakages of fluid as far as practicable. Drilling fluid is prepared and pumped into the hole according to predetermined program on semiautomatic mode, and volume and density of blended and pumped into the hole drilling fluid are measured continuously. Compo- nents of the drilling fluid are stored and mixed in the special closed containers equipped by pressure relief valves. Separation of drilling fluid from ice cuttings is carried out by two steps: firstly, fluid is separated with hydro extractor and then with thermal separator. To reduce the amount of removed drilling fluid with cable spe- cial squeezing collar is installed on the borehole mouth. All these arrangements are able to decrease drilling flu- id wastes in many times.
出处 《Global Geology》 2013年第2期99-105,共7页 世界地质(英文版)
基金 Supported by the National Natural Science Foundation of China(No.41276189)
关键词 钻井液处理 电缆 演习 机电 钻井液循环系统 钻井流体 悬浮 热分离器 polar drilling drilling fluid cable-suspended electromechanical drill
  • 相关文献

参考文献8

  • 1ASME Shale Shaker Committee. 2011. Drilling fluids process- ing handbook. Elsevier, 1-666.
  • 2Gosink T A, Kelley J J, Tumeo M A, et al. 1994. Fluids for use in deep ice-core drilling. Memoirs of National Institute of Polar Research, 49 ( Suppl. ) : 335-346.
  • 3Johnsen S J, Hansen S B, Sheldon S G, et al. 2007. The Hans Tausen drill: design, performance, further develop- ments and some lessons learned. Annals of Glaciology, 47 : 89-98.
  • 4Kudryashov B B, Vasiliev N I, Talalay P G. 1994. KEMS-112 electromechanical ice core drill. Memoirs of National In- stitute of Polar Research, 49( Suppl. ) : 138-152.
  • 5Shturmakov A J, Lebar D A, Mason W P, et al. 2007. A new 122ram electromechanical drill for deep ice-sheet coring (DISC) : 1. Design concepts. Annals of Glaciology, 47 : 28 -34.
  • 6Talalay P G. 2003. Power consumption of deep ice electrome- chanical drills. Cold Regions Science and Technology, 37 : 69 -79.
  • 7Talalay P G. 2005. Removal of cuttings in deep ice electrome- chanical drills. Cold Regions Science and Technology, 44 : 87 -98.
  • 8Talalay P G, Gundestrup N S. 2002. Hole fluids for deep ice core drilling. Memoirs of National Institute of Polar Re- search, 56(Suppl. ) : 148-170.