期刊文献+

神华集团煤炭产运销一体化调运优化模型 被引量:8

Integration optimization model for coal dispatching work of Shenhua Group
下载PDF
导出
摘要 依据神华集团独特的煤炭生产、运输和销售一体化经营模式,以集团价值创造最大化为目标函数,以业务需求和业务能力为约束条件,综合考虑了生产、运输和销售各环节的业务冲突的消解,构建并实现了煤炭产运销一体化调运多目标整数优化模型,为神华集团煤炭调运工作提供科学合理的精细化管理工具。 The coal business of Shenhua Group has uniquely integrated production, transportation and sales. This paper built and implemented a multi-objective integer optimization model for the integrative coal dispatching work of Shenhua Group. The model takes the business needs and operational capacity of the coal supply chain as constraints, and maximizes the value creation of Shenhua Group. It also considers the conflict resolution among coal production, transportation and sales, and provides a scientific, practical and precise management tool for Shenhua Group coal dispatching work.
出处 《计算机应用》 CSCD 北大核心 2013年第A01期295-297,共3页 journal of Computer Applications
关键词 煤炭调运 调运优化 整数规划 多目标优化 冲突消解 coal dispatching dispatching optimization integer programming multi-objective optimization conflict resolution
  • 相关文献

参考文献6

二级参考文献22

  • 1彭晨,岳东.煤炭供应链的工作流描述方法[J].南京师范大学学报(工程技术版),2004,4(2):49-52. 被引量:10
  • 2赵天智,金以慧.基于依赖关系的供应链优化协调[J].计算机集成制造系统,2004,10(8):929-933. 被引量:14
  • 3陈建生,王立杰.论煤炭企业物流供应链联盟[J].管理世界,2004,20(11):148-149. 被引量:40
  • 4赵晓煜,黄小原,孙福权.面向重要供应商和客户的供应链设计方法[J].系统工程,2005,23(6):34-38. 被引量:19
  • 5COHEN M A, LEE H L. Strategic analysis of integrated production-distribution system: model and methods [J]. Operations Research, 1988,36(2) ..216-220.
  • 6NAGURNEY A, DONG J, ZHANG D. A supply chain network equilibrium model[J]. Transportation Research, Part E, 2002,38(5): 281-303.
  • 7MAHERT V A, VENKALARAMANAN M A. Special research focus on supply chain linkages: challenges for design and management in the 21st century[J]. Decision Science, 1998,29(3) :537-552.
  • 8SABRI E H, BEAMON B M. A muhiobjective approach to simultaneous strategic and operational planning in supply chain design[J]. International Journal of Management Science,2000,28(6) :581-598.
  • 9McMahon G B, Lim C J. The two-meachine flow shop problem with arbitrary precedence relations[J].European Journal of Operational Research, 1993, 64(2) :249-257.
  • 10Lim C J, McMabon G B. The three-machine flow shop problem with arbitrary precedence relations[J].European Journal of Operational Research, 1994, 78(1) :216-223.

共引文献24

同被引文献66

引证文献8

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部