摘要
全面介绍了沉井方案的选择、沉井的制作、施工及沉井下沉过程中的纠偏处理 ,为闹市区高层建筑物地下室的施工提供了成功经验。
The plans selection,formation,construction of sunk wells and its correction for deflection during the subsidence of sunk well were introduced.The experience obtained from the engineering can be useful to the construction of basement of high rise buildings in down town area.