期刊文献+

供求不确定下零部件供应商横向协同研究 被引量:8

Horizontal Synchronization between Component Suppliers under Uncertainty of Supply and Demand
下载PDF
导出
摘要 考虑了由2个供应商与1个制造商组成的按订单装配的供应链模型。在供应商的零部件供应不确定、制造商的客户需求不确定的环境下,从多供应商的视角来研究如何通过供应商之间形成零部件横向协同,向制造商齐套供应零部件,从而降低制造商的期望总库存成本。首先,建立了单周期和多周期的理论模型,并对形成协同前后的期望总库存成本进行了比较;然后,通过模拟仿真的方法,对模型进行验证和比较,并分析了不同的缺货成本对最优订单量、最优订至点和最小期望总库存成本的影响。结果表明,多供应商之间的零部件横向协同降低了制造商的期望总库存成本,提高了对客户需求的响应。 This paper considers a supply chain model comprised of two suppliers and one manufac turer in Assembly-To-Order environment. Under the uncertainty of component supply and customer demand, it investigates how to come into component horizontal synchronization between multi-suppli- ers from the perspectives of suppliers, and supply components in set to manufacturer, which could decrease the manufacturer's expected total inventory cost. Firstly, it presents the theory model in singleperiod and multi-period, and compares the expected total inventory cost before and after synchronization. Secondly, through the simulation method, it validates and compares the models, and analyzes the different shortage cost's impact on optimal order quantity, optimal order-up-to level and minimal expected total inventory cost. Finally, the result shows that component horizontal synchronization between multi-suppliers could decrease the manufacturer's expected total inventory cost and improve the response to customer's demand.
出处 《管理学报》 CSSCI 北大核心 2013年第7期1054-1059,共6页 Chinese Journal of Management
基金 国家自然科学基金资助项目(71072035)
关键词 不确定 横向协同 供应商视角 按订单装配 uncertainty horizontal synchronization suppliers' view assembly-to-order
  • 相关文献

参考文献11

  • 1XIAO Y B, CHEN J,LEE C Y. Optimal Decisionsfor Assemble-To-Order Systems With Uncertain As-sembly Capacity [J]. Int. J. Production Economics,2010,123 (1) :155-165.
  • 2HSU V N,LEE C Y,SO K C. Optimal ComponentStocking Policy for Assemble-to-Order Systems withLead-Time-Dependent Component and Product Pri-cing [J]. Management Science, 2006 , 52(3) : 337-351.
  • 3CIARALLOF W, AKELLA R,MORTON T E. APeriodic Review, Production Planning Model withUncertain Capacity and Uncertain Demand- Optimali-ty of Extended Myopic Policies[J]. Management Sci-ence, 1994,40(3):320-332.
  • 4HENIG M, GERCHAK Y. The Structure of Period-ic Review Policies in the Presence of Random Yield[J]. Operations Research, 1990,38(4) :634-643.
  • 5GERCHAK Y, WANG Y, YANO C A. Lot Sizingin Assembly Systems with Random Component Yields[J]. IIE Transacrions,1994, 26(2) :19-24.
  • 6GURNANI H,AKELLA R, LEHOCZKY J. SupplyManagement in Assembly Systems with RandomYield and Random Demand [J]. IIE Transactions,2000,32(8):701-714.
  • 7ZIMMER K. Supply Chain Coordination with Uncer-tain Just-in-Time Delivery [J]. Int. J. ProductionEcnomics, 2002,77(1): 1-15.
  • 8SZWEJCZEWSKI M, LEMKE F, GOFFIN K. Man-ufacturer-Supplier Relationships an Empirical Studyof German Manufacturing Companies [J]. Interna-tional Journal of Operations Production Manage-ment, 2005,25(9) : 875-897.
  • 9GOFFIN K, LEMKE F, SZWEJCZEWSKI M. AnExploratory Study of ‘Close’ Supplier-ManufacturerRelationships [J]. Journal of Operations Manage-ment ,2006,24 (2): 189-209.
  • 10KIM B, OH H. The Impact of Decision-MakingSharing between Supplier and Manufacturer onTheir Collaboration Performance [J]. Supply ChainManagement: An International Journal, 2005, 10(3):223-236.

同被引文献57

  • 1Tuomikangas N, Kaipia R. A coordination frame- work for sales and operations planning: synthesis from the lit- erature [ J ]. International Journal of Production Economics, 2014,154(1) : 243 -262.
  • 2Pezeshki Y, Baboli A, Cheikhrouhou N. A rewarding punishing coordination mechanism based on trust in a diver- gent supply chain [ J ]. European Journal of Operational Re-search,2013,230( 1 ) :527 - 538.
  • 3Low C,Chang C M, Li R K. Coordination of pro- duction scheduling and delivery problems with heterogeneous fleet [ J ]. International Journal of Production Economics, 2014,153(1) :139 - 148.
  • 4V N Hsu, C Y Lee, K C So. Optimal Component Stocking Policy for Assembly - to - Order Systems with Lead - Time - Dependent Component and Product Pricing[ J]. Management Science. 2006, 52(3) :337 -351.
  • 5Y B Xiao, J Chen, C Y Lee. Optimal Decisions for Assembly - To - Order System With Uncertain Assembly Capacity [ J ]. Produc- tion Economics, 2010,123 ( 1 ) : 155 - 165.
  • 6D Gupta, W Weerawat. Supplier - manufacturer coordination in capacitated two -stage supply chains[J]. European Journal of Op- erational Research, 2006,175:67 - 89.
  • 7B Kim, K 0 Heungshi. The impact of decision - making sharing between supplier and manufacturer on their collaboration perform- ance [ J ]. Supply Chain Management: An International Journal. 2005,10(3) : 223 -236.
  • 8钱宇,陈剑.供应链中考虑下游转运的订货和定价决策研究[J].中国管理科学,2008,16(1):53-59. 被引量:21
  • 9黄凯南.演化博弈与演化经济学[J].经济研究,2009,44(2):132-145. 被引量:259
  • 10宋华岭,温国锋,李金克,张漪.基于信息度量的企业组织系统协同性评价[J].管理科学学报,2009,12(3):22-36. 被引量:23

引证文献8

二级引证文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部