摘要
为实现梅山铁矿开采结构参数从现有的 ( 1 0~ 1 3)m× 1 0m合理过渡到 1 5m× 1 5m ,对影响过渡分段采矿损失、贫化指标的原因进行了分析 ,采用实验室物理模拟、现场定量测定等手段 ,找出了过渡阶段不同分段矿石流动规则 ,实行了采用截止品位放矿的放矿管理办法 ,在生产中获得成功应用。
To realize the rational transition of the mining structure parameter of Meishan Iron Mine from the existing (10~ 13)m×10m to 15m×15m,analysis was made of the factors that affected the dilution and loss of the transitional level mining.Laboratory physical simulation and on site quantitive measurement were used to find out the ore flowing law of different levels between the transitional sections and the cut off grade method was adopted for ore drawing management,which achieved success in production
出处
《金属矿山》
EI
CAS
北大核心
2000年第8期20-22,共3页
Metal Mine
关键词
结构参数
过渡分段
损失
贫化
放矿
铁矿
Structural parameter,Transitional levels,Loss,Dilution,Ore drawing