摘要
介绍了尾矿坝防冲刷的必要性。针对德兴铜矿的特点 ,提出尾矿坝防冲刷的施工方案、工艺流程及设备的配置。对试验中出现的问题进行了改进与提高。
The necessity of tailings dam erosion protection is described and the construction scheme,technological flowsheet and equipment configuration for tailings dam erosion protection are suggested in view of the characateristics of Dexing Copper Mine.A comprehensive analysis of the erosion protection effects are made and opinions on its further improvement are given.
出处
《金属矿山》
CAS
北大核心
2000年第8期25-27,共3页
Metal Mine