摘要
以南宁华润中心大厦项目施工为背景,探讨挖孔桩施工的过程。阐述挖孔桩施工方案的确定、施工工艺流程、常见的事故及处理方法和相关的质量验收标准,从中得出一些基本规律,对今后相关工程提供一些借鉴。
This paper analyzes the construction process of hole digging pile based on the project of Nanning Huarun Center Building.The construction program,the construction technical process,the processing method of the common accident and the correlation quality approval standard are illustrated,and some basic rules are obtained in this paper,which will provide some references to the relative project in the future.