摘要
根据联合进水塔所处区域地质条件及塔式结构的特点,在结构布置及地基处理时采取了有效可行的工程措施,提高了塔体结构的抗震安全性和基础承载能力。经过8年的运行,进水塔结构稳定,应用效果很好,施工采用的抗震设计方法及地基处理措施得到了考证,可供类似工程设计参考。
According to the geological conditions and structural features of joint intake tower,effective and feasible measures were adopted during structural layout and foundation treatment to improve the earthquake resistance of tower structure and bearing capacity of foundation.The intake tower is stable after 8 years of operation so its earth quake-resistant design method and foundation treatment measures may be reference for similar projects.
出处
《广西水利水电》
2013年第3期19-21,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
进水塔
结构布置
抗震设计
地基处理
措施
Intake tower
structural layout
earthquake-resistant design
foundation treatment
measure