摘要
围绕泸定水电站施工特点,从安全措施选用、责任体系、评审论证、投入保障、建章立制和现场管理等方面浅谈了该工程的施工安全措施。这些安全措施在泸定水电站施工中的良好运用,保障了工程全过程施工安全,实现了施工期间"零事故"目标,取得较好的管理效果和经济效益。
Centering around the construction features of Luding Hydropower Station,an introduction was made on the construction safety measures in respects of selection of safety measures,responsibility system,assessment and examination,investment guarantee,draft and implementation of regulations,site management.These safety mea sures were well applied during construction,which safeguards the whole-process construction safety with the objec tive of zero accident achieved,and renders good management effects and economic benefits.
出处
《广西水利水电》
2013年第3期85-88,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
泸定水电站
施工
安全
措施
Luding Hydropower Station
construction
safety
measure