期刊文献+

万州天城连接路改造设计研究

Study on Reconstruction Design of Wanzhou Tiancheng Connecting Road
下载PDF
导出
摘要 万州天城连接路为典型的山地城市改造工程,道路沿线地形复杂高差起伏大、两侧建筑物多且拆迁困难、地上地下构造物多且资料收集困难、控制因素多。设计综合考虑以上设计条件,并将处理好新建道路与老路衔接和交通转换、新建道路与两侧周边建筑关系、新建道路与地块开发建设统一协调关系作为设计重点和难点。通过设计和施工过程中遇到问题对山地城市改造项目进行总结分析,提出设计思路和应对措施。 Wanzhou Tiancheng Connecting Road is a typical mountain city reconstruction project.Its terrain along the road is complex with the different elevations,more buildings hard to be relocated at both sides,and more ground and underground structures with many factors hard to collect the information and to control.According to the above conditions,the design focuses and the difficulties are comprehensively considered in the design in order to handle the connection and the traffic conversion of the newly built roads and the old roads,the relationship of the newly built rods and the surrounding buildings at both sides,and the unified coordinating relationship of the newly built roads and the land development construction.The article sums up and analyzes the problems in the design and construction of mountain city reconstruction project,and puts forward the design idea and the countermeasures.
出处 《城市道桥与防洪》 2013年第6期18-20,23,共3页 Urban Roads Bridges & Flood Control
关键词 山地城市道路 改造工程 设计思路 mountain city road,reconstruction project,design idea
  • 相关文献

参考文献3

  • 1DBJ50-064-2007,城市道路交通规划及路线设计规范[s].重庆:重庆市建设委员会,2007.
  • 2CJJ37-2012,城市道路设计规范[s].北京:北京建筑工业出版社,2012.
  • 3林同棱国际工程咨询(中国)有限公司.万州天城连接路设计方案报告[R].2010.

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部