摘要
全寿命周期成本管理的研究范畴是工程项目的整个生命期,其初期投入相对较大,而后期在成本控制方面的高效和可持续性优势十分明显。该文介绍了全寿命周期成本管理在实际工程中的应用。上海虹桥国际机场东跑道大修项目基于全寿命周期成本控制的理念,经过科学的比选,采用中厚层加铺方式进行不停航施工。在项目建设期间,全寿命周期成本管理理念全方位、多角度的运用使工程也在经济、环境、社会方面均获得了良好的效益,为全国民航机场工程建设特别是老跑道的大修改造提供一个很好的样板和示范。
The study category of life cycle cost management is the whole life cycle of engineering project.Its initial investment is relative larger,but its later cost control is high efficiently and its sustainable superiority is very obviously.The article introduces the application of life cycle cost management in the practical projects.Based on the concept of life cycle cost control and after the scientific comparison,Shanghai Hongqiao International Airport East Runway Overhaul Project is constructed without closing the airport by medium bed overlay mode.In the project construction,the concept of life cycle cost management is applied from an all-around point of view to make a project achieve the good benefits in the aspects of economy,environment and society,which can provide a good sample and demonstration for the engineering construction of the civil aviation airports of China,especially for the overhaul reconstruction of the old runways.
出处
《城市道桥与防洪》
2013年第6期204-207,9,共4页
Urban Roads Bridges & Flood Control
关键词
全寿命周期
成本管理
上海虹桥国际机场
东跑道大修
应用与成效
life cycle,cost management,Hongqiao International Airport,overhaul of East Runway,application and effect