摘要 在深厚堆积体中锚索成孔困难,尤其是80 m以上锚索成孔的经验匮乏。为解决枕头坝一级水电站1号堆积体深孔锚索成孔难题,通过实验排除单层和双层套管成孔方法,选取单层套管与护壁灌浆相结合的施工工艺,实践证明,该工艺在工效、经济性方面效果较好,是解决堆积体深孔锚索造孔的有效途径。 It is hard to complete a deep hole for anchor cable in thick accumulation body, especially for those with depth of more than 80 m. In Zhentouba first stage hydropower station, in order to complete the deep hole in 1 # accumulation body, the combination of single layer casing and wall protection grouting was selected. The practice shows that this technology is effective to complete deep hole for anchor cable in accumulation body.
出处 《探矿工程(岩土钻掘工程)》 2013年第6期81-84,共4页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 堆积体 深孔锚索 跟管钻进 护壁灌浆 成孔工艺 水电站 accumulation body deep hole anchor cable drilling with casing wall protection grouting hole completion technology hydropower station
  • 相关文献

参考文献6

二级参考文献12

共引文献18

同被引文献8

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部