摘要
结合实际测试及新颁布JJG1079—2013《铁路轨道信号测试设备综合校验装置》,分析铁路轨道信号测试设备综合校验装置的量值溯源问题,介绍开展该设备移频信号检定时应注意的问题,提出解决方案建议,分析对不确定度的影响。
By combining with the actual test and the newly published JJG 1079-2013 "Comprehensive Calibrator for the Test Device of Railway Track Signaling", the authors analyze the traceability of the comprehensive calibra- tor for test device of railway track signaling, introduce the problems that should be concerned during the course of carrying out calibration of frequency-shift signaling by using this device, and suggest corresponding solutions, ana- lyze the influence on uncertainty degree.
出处
《铁道技术监督》
2013年第6期7-9,共3页
Railway Quality Control
关键词
轨道信号
测试设备
综合校验装置
移频键控信号
检定
Track Signaling
Test Equipment
Comprehensive Calibrator Device
Frequency-shift Keying Sig- naling
Calibration