摘要
2009年枯水期,石角站开始采用清远(三)站相应水位与该站实测流量定线推流,解决感潮为流量资料整编带来的难题。2011年11月,随着上游清远水利枢纽的蓄水,相应水位法已无法使用。为了解决该问题,探讨感潮时段的流量推求方法,建立了石角—三水(二)站日平均水位差与日平均流速之间的关系。结果表明,确定上下游站日平均水位差与日平均流速关系的方法是可行的。
Shijiao Hydrometric Station began to use equivalent stage of Qingyuan (3) station and measured discharge on discharge computation to solve the new problems on discharge data processing which were brought by the tidal hy- drometry section in the low-flow period in 2009. In November 2011, with the storage of Qingyuan water conservancy hub, the method of equivalent stage Can not be used. In order to solve this problem, this paper discusses the method of discharge computation in tidal time and studies the relation between daily mean fall of Shijiao-Sanshui (2) station and daily mean velocity. The results show that the way of setting up the relation between daily mean fall of up-downstream and daily mean velocity is feasible.
出处
《广东水利电力职业技术学院学报》
2013年第2期1-4,共4页
Journal of Guangdong Polytechnic of Water Resources and Electric Engineering
关键词
感潮时段
石角站
枯水期
推流
Idal time
Shijiao Station
Low-flow period
Discharge computation