期刊文献+

感潮时段的推流方法探讨——以石角水文站2011年汛后枯水期为例

Discussion on Method of Discharge Computation in Tidal Time——with Low-flow Period after Flood Season (2011) of Shijiao Hydrometric Station as an Example
下载PDF
导出
摘要 2009年枯水期,石角站开始采用清远(三)站相应水位与该站实测流量定线推流,解决感潮为流量资料整编带来的难题。2011年11月,随着上游清远水利枢纽的蓄水,相应水位法已无法使用。为了解决该问题,探讨感潮时段的流量推求方法,建立了石角—三水(二)站日平均水位差与日平均流速之间的关系。结果表明,确定上下游站日平均水位差与日平均流速关系的方法是可行的。 Shijiao Hydrometric Station began to use equivalent stage of Qingyuan (3) station and measured discharge on discharge computation to solve the new problems on discharge data processing which were brought by the tidal hy- drometry section in the low-flow period in 2009. In November 2011, with the storage of Qingyuan water conservancy hub, the method of equivalent stage Can not be used. In order to solve this problem, this paper discusses the method of discharge computation in tidal time and studies the relation between daily mean fall of Shijiao-Sanshui (2) station and daily mean velocity. The results show that the way of setting up the relation between daily mean fall of up-downstream and daily mean velocity is feasible.
作者 王宁
出处 《广东水利电力职业技术学院学报》 2013年第2期1-4,共4页 Journal of Guangdong Polytechnic of Water Resources and Electric Engineering
关键词 感潮时段 石角站 枯水期 推流 Idal time Shijiao Station Low-flow period Discharge computation
  • 相关文献

参考文献4

  • 1陈燕霞.河床下切对北江石角站水文测报影响的研究[J].广东水利水电,2012(3):39-41. 被引量:6
  • 2中华人民共和国水利部冰文资料整编规范(SL247-1999)[S].1999:12.
  • 3中华人民共和国水利部.声学多普勒流量测验规范(SL337-2006)[S].2006:4.
  • 4广东省水文局广州水文分局.麒麟咀(二)站Arg-onaut-SL在线测流系统比测分析报告[R].2010:1.

二级参考文献3

  • 1中华人民共和国水利部.GBJ 138-1990.水位观测标准,水位观测标准</a>[S]1990.
  • 2中华人民共和国水利部.GB 50179-1993.河流流量测验规范,河流流量测验规范</a>[S]1993.
  • 3中华人民共和国水利部.SL 58-1993.水文普通测量规范,水文普通测量规范</a>[S]1993.

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部