日照港二期商检配套工程设计

Design of CCIB Works Associated with Phase-Ⅱ Project of Rizhao Port
下载PDF
导出
摘要 介绍国家“八五”重点项目——日照港二期商检配套工程的规模及工程设计的概况。其中主要叙述了检验工艺设计所依据的国家标准、检验办公楼、供电与照明、给水、排水。 This paper presents the scale and engineering design of the Rizhao based commodity inspection facility of CCIB, which is associated with one of the key national construction projects for the Eighth Five year Plan period known as Rizhao Port Consturction (Phase Ⅱ Project). It generally describes the national code of practices on which the inspection processes are based as well as the engineering characteristics of inspection building, power supply and lighting, water supply and drainage, fire service, ventilation aqnd other associated works.
作者 杨志国
机构地区 中交一航院
出处 《港工技术》 北大核心 2000年第3期8-9,共2页 Port Engineering Technology
关键词 日照港 商检配套工程 检验工艺 工程设计 Rizhao Port facilities of CCIB inspection technologic processes engineering design