基于精益建造理论的工程项目成本控制分析 被引量:2

Analysis of Project Cost Control Based on Lean Construction Theory
下载PDF
导出
摘要 提出了在建筑业内引入精益建造理论的观点,构建基于精益理论的成本控制管理新模式.从传统施工组织设计的角度出发,以某工程施工现场发生的实际成本数据为基础,构建了支持精益建造理论的各单项成本和浪费指标的数学模型,进一步分析确定的各项指标与时间的函数关系.最后,运用工程优化方法对总成本目标函数中主要指标进行敏感性分析,得到了主要浪费指标对施工现场总成本的影响程度. This paper introduces the principles of lean construction, and a new cost control management model is built based on lean thinking. From the perspective of traditional constmction design, combined with actual cost data of one construction project, a mathematical model is built about construction project cost and waste indicators based on lean construction theory. The function relationship between each indica- tor and time is identified and analyzed. Finally, the engineering optimization method is used to perform sen- sitivity analysis of main indicators in the total cost objective function. The influence degree of main waste indicators on the total cost of the construction project is obtained.
作者 韩凌风 秦荣
出处 《成都大学学报(自然科学版)》 2013年第2期206-210,共5页 Journal of Chengdu University(Natural Science Edition)
关键词 精益建造 成本控制 工程优化 敏感性分析 lean construction cost control engineering optimization sensitivity analysis
  • 相关文献

参考文献5

二级参考文献9

共引文献46

同被引文献32

  • 1邱光宇,刘荣桂.在我国建筑业推行精益建设的研究[J].建筑经济,2007,28(1):56-58. 被引量:17
  • 2陈林,苏振民.工程项目设计与施工整合研究[J].商业时代,2007(25):66-67. 被引量:3
  • 3Gurevich U, Sacks R. Examination of the effects of a KanBIM production control system on subcontractors' task selections in interior works [ J ]. Automation in Construction, 2014 ( 37 ) : 81- 87.
  • 4Costin A, Pradhananga N, Teizer J, et al. Cooperative Design, Visualization, and Engineering [ M ]. Springer Berlin Heidel- berg,2012:41- 48.
  • 5Ghio V A, Valle E, Rischmoller L. Preplanning: A rewarding experience [ J ]. Retrieved October, 1997 ( 11 ) : 2002.
  • 6Wyatt A, Mohamed S, TiUey P. A. Indicators of design and documentation deficiency [ C ]. Proceedings of the Fifth Annual Conference of the International Group for Lean Construction, 1997 : 137-148.
  • 7Fischer M, Akinci B. O, Brien W. Importance of Site conditions and capacity allocation for construction cost and performance: A case study[ C ]. Int. Conf. on Lean Construction, 1997:77- 89.
  • 8Russell M M, Howell G, Hsiang S M, et al. Application of Time Buffers to Construction Project Task Durations [ J ]. Journal of Construction Engineering and Management, 2013,139 ( 10 ) : 79-82.
  • 9Perlman A, Sacks R, Barak R. Hazard recognition and risk per- ception in construction [ J ]. Safety science,2014 (64) :22-31.
  • 10章蓓蓓,苏振民,金少军.精益建造体系下项目流程管理研究[J].工业技术经济,2008,27(3):77-79. 被引量:15

引证文献2

二级引证文献3