摘要
介绍了溪洛渡水电站水垫塘底板面层抗冲磨硅粉混凝土的生产、运输、浇筑、养护的控制以及施工配合比优化对混凝土温升的影响。通过对各环节的有效控制,使混凝土浇筑质量整体受控。
The quality control of manufacture, transportation, pouring, curing of anti-abrasion silicate powder concrete for plunge pool baseboard in Xiluodu Hydropower Station and the influence of pouring mix design optimization on concrete temperature rise are introduced. Owing to efficient control of each link, whole concrete quality is under control.
出处
《粉煤灰》
2013年第3期40-43,共4页
Coal Ash China
关键词
水垫塘工程
质量控制
混凝土温升
配合比优化
Plunge Pool Project
Quality Control
Concrete temperature rise Mix design optimization