摘要
结合工程实例,介绍了在有粘结预应力混凝土施工过程中问题的优化方法,通过验算选择张拉时的混凝土强度,采用加腋的方式对预应力施工进行了优化,节省了工期,降低了对其他工序的影响,值得类似工程参考。
Combining with engineering examples,this paper introduced the optimization method of bonded pre-stressed concrete in construction process,through checking to select the concrete strength in tension,using the haunch way,optimized the pre-stressed construction,saved construction time,reduced the impact on other process,worthy of reference for similar engineerings.
出处
《山西建筑》
2013年第21期105-106,共2页
Shanxi Architecture
关键词
施工优化
有粘结预应力
强度
construction optimization
bonded pre-stressed
strength