摘要 介绍了M701F3型机组启动前吹扫时间的设置,论述并对比了国际上有关余热锅炉及燃气轮机排气系统吹扫的安全标准。以杭州锅炉厂NG-M701F-R余热锅炉为例,分别依据不同的吹扫安全标准,对M701F3型机组启动前吹扫时间进行了计算,讨论了进一步缩短吹扫时间提高效率的弹性吹扫方案的可行性。 MTO1F3 C/C unit needs a purge for 550s before ignition to start up its operation. In order to minimize energy, consumption for the safety, some industrialized contries have enacted related standards to guide the gas turbine industrial development. By applying several international industrial standards to M701F3 C/C unit which combines an NG-MTO1F-R HRSG produced by Hangzhou Boiler Corporation of China, this paper adjusts the most efficient setting, and discusses the further adjustment feasibility.
作者 徐刚 张蕴峰
出处 《东方电气评论》 2013年第2期56-60,77,共6页 Dongfang Electric Review
关键词 M701F3 NG—M701F—R余热锅炉 吹扫 M701F3 NG-M701F-R HRSG purge
  • 相关文献

参考文献7

  • 1National FiE Protection Association. NFPA 8506 Standard on Heat Recovery Steam Generator System 1998 Edition [ S]. USA. 1998.
  • 2National Fire Protection Association. NFPA 85 Boiler and Combustion systems hazards code 2001 Edition [ S]. USA. 2001.
  • 3Internation Standerd Organization. ISO 3977 Gas Turbines - Procurement [ S].
  • 4中国国家标准化管理委员会.GB/T14099燃气轮机采购[S].
  • 5Japanese Standerd Association. JIS B 8042 - 1 -2001 Gas Turbines-Procurement-Part 1: General introduetinn and definitions [S] JP. 2001.
  • 6Internation Standerd Organization. 1SO 21789 Gas turbine applications-Safety 2009 [ S ].
  • 7Roger C. Santon . "ISO 21789, A New Gas Turbine Safety Standerd". Proceedings of ASME Turbo Exop 2009, Orlando, Florida, USA.

共引文献1

同被引文献15

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部