3M.R.Bowers,L.A.Kaplan,T.L.Hooker.A two-phase model for planningthe production of aluminum ingot[J].Europen Journal of OperationalResearch,1995(81):103-104.
4Marc Gravel,Wilson L Price,Caroline Gagne.Scheduling jobs in anAlcan aluminium foundry using a genetic algorithm[J].Int.J.Prod.Res.,2000,38(13):3031-3041.
5Marc Gravel,Wilson L.Price.Scheduling continuous casting of aluminumusing a multiple objective ant colony optimization metaheuristic[J].European Journal of Operational Research,2002(143):218-229.