旧池改建中安装新套管工程质量控制

Quality Control of Installing the New Casing on the Reconstruction of the Old Pool
下载PDF
导出
摘要 针对旧池改建工程,介绍了在已建水池池壁上开孔安装新套管和孔口加固的方法及施工质量控制的要点,可有效保证改造工程中新套管的安装准确和牢固,满足工艺流程的需求。其设计及施工质量的优劣是水厂改建后能否顺利运行的关键。 For the project of pool reconstruction, the methods of installing a new waterproof casing and the orifice reinforcement on the built pool wall, and the key point of construction quality control are introduced. The accuracy and secure of the new casing installation in the project of pool reconstruction is ensured, which meets the needs of the process flow. The quality of its design and construction is the key to make the water plant run in order after its reconstruction.
作者 周丽丹
出处 《四川理工学院学报(自然科学版)》 CAS 2013年第3期68-70,共3页 Journal of Sichuan University of Science & Engineering(Natural Science Edition)
基金 吉林省科技发展计划项目(201201132)
关键词 旧池改造 套管安装 质量控制 reconstruction pool installing casing quality control
  • 相关文献

参考文献6

  • 1GB50367-2006,混凝土结构加固设计规范[S].
  • 2北京市市政工程设计研究总院.防水套管[M].北京:中国标准设计研究院出版社,2002.
  • 3GB50204-2002(2011版),混凝土结构工程施工质量验收规范[S].
  • 4CECS146:2003(2007版),碳纤维片材加固混凝土结构技术规程[S].
  • 5GB50141-2008,给水排水构筑物工程施工及验收规范[S].
  • 6曾华.污水处理厂预埋防水套管安装工程浅析[J].环境保护与循环经济,2010,30(12):55-57. 被引量:5