期刊文献+

基于模糊层次模型的施工项目风险分析 被引量:1

Construction Project Risk Analyses Based on Fuzzy Hierarchical Model
下载PDF
导出
摘要 为了保证施工项目的顺利进行,高速公路施工风险评估越来越受到重视,然而目前尚未建立科学的施工风险评估体系。因此,基于公路施工风险因素的构成,从成本、工期、质量和人等四个方面,提出了公路施工风险评估指标体系;建立了基于模糊层次分析的风险评估模型,对施工项目风险进行了实例分析,从而为高速公路施工项目风险评估提供了依据。 In order to assure the smooth construction project, the risk assessment for highway con struction draws more and more attention. However, a scientific risk assessment system for the high way construction has not been established. So the paper puts forward the index system of risk assess ment for the highway construction from the four aspects of cost, schedule, quality and persons, based on the constitution of risk factors. An risk assesment model based on fuzzy analytic hierarchy process should be set up to carry on the analyses of risks in the projects so as to provide the basis for risk as sessment in the highway construction projects.
作者 李晓辉
出处 《安徽职业技术学院学报》 2013年第2期16-20,共5页 Journal of Anhui Vocational & Technical College
关键词 施工项目 风险评估 改扩建工程 模糊层次分析 指标体系 construction project risk assessment renovation and expansion project fuzzy analyt-ic hierarchy process index system
  • 相关文献

参考文献7

二级参考文献5

共引文献39

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部