期刊文献+

金沙江鲁地拉水电站上游过水围堰设计与运行 被引量:6

Design and operation of upstream overflow cofferdam for construction of Ludila Hydropower Station on Jinshajiang River
下载PDF
导出
摘要 鲁地拉水电站上游过水围堰采用土石—碾压混凝土混合过水围堰,该围堰建在深厚覆盖层上,具有大流量、高水头、长历时的过水特点。围堰建成后,经历3个汛期过水考验,运行良好。本文介绍该围堰的设计与运行情况,可供其他工程参考。 The upstream overflow cofferdam for construction of Ludila Hydropower Station is an earth-rockfill-roller compacted concrete combined one, which is on a deep overburden layer and has the overflow characteristics of large flow rate, high head and long duration. After the completion, it experiences the overflows from three flood seasons with a better operation status. The design and operation of the cofferdam are described herein, so as to provide a reference for the other similar project.
出处 《水利水电技术》 CSCD 北大核心 2013年第6期86-89,共4页 Water Resources and Hydropower Engineering
关键词 鲁地拉水电站 过水围堰 大流量 高水头 长历时 Ludila Hydropower Station overflow cofferdam large flow rate high head long duration
  • 相关文献

参考文献5

  • 1郑守仁,王世华,夏仲平,等.导流截流及围堰工程(下册)[M].北京:中国水利出版社,2005.
  • 2胡建明,胡志根,杨学红,肖焕雄.土石过水围堰过水期最不利工况及其流量确定[J].水动力学研究与进展(A辑),2003,18(3):266-270. 被引量:22
  • 3杨鑫平,康文军,等.金沙江鲁地拉水电站工程土石过水围堰设计报告[R].西安:中国水电顾问集团西北勘测设计研究院,2008.
  • 4DL/T395-2007,碾压式土石坝设计规范[s].
  • 5胡志根,槐文信,雷川华,等.鲁地拉水电站施工导流过水围堰模型试验、数值模拟与现场原型观测研究总报告[R].武汉:云南华电鲁地拉水电有限公司,中国水电顾问集团西北勘测设计研究院,武汉大学水利水电学院,2010.

二级参考文献4

共引文献25

同被引文献39

引证文献6

二级引证文献3