2Brill, E. D., Nakamura, M.. A branch and bound method for use in planning regional wastewater treatment systems [J ]. Wat. Res. Res, 1978, 14( 1 ) : 109-118.
3Lauria, D. T.. Desk calculator model for wastewater planning [ J ]. J. Environ. Engng, ASCE, 1979, 105 ( 1 ) : 113-120.
4郊扬普.城市污水处理--投资与决策[M].北京:中国环境科学出版社,1992:204-212.
5Word Bank. Handbook for Assessment of Wastewater Treatment Plant [ M ]. Washington, 1996.
6GB50180-93.城市居住区规划设计规范[s].[S].,..
7GB50336-2002.建筑中水设计规范[S].[S].,..
8傅国伟,程声通.水污染控制规划[M].北京:清华大学出版社,1985.
9Richerd W C,Ann M H.Setting reclaimed water ratesreasonable rates play a large role in encouraging public support for a reclaimed water system[J].AWWA,1999,91(8):50 -57.