摘要
钢铁企业进行节能技术改造时,经常遇到CCPP(燃汽蒸汽联合循环发电)方案与常规煤气发电方案的选择问题,尤其以50 MW级CCPP与高温高压常规煤气发电机组的选择为甚。通过对两种方案的技术经济对比分析为钢铁企业选择合适的节能改造方案提供借鉴。
Problems of the choice of CCPP (Combined Cycle Power Plano scheme and conventional gas power scheme are fre- quently encountered in the energy-saving technological transformation of iron and steel enterprises, especially the choice of 50 MW CCPP and the high temperature and pressure conventional gas power set. Analyzes the technical and economic comparison between two schemes to offer references for the choice of suitable energy-saving technological transformation schemes of iron and steel enterprises.
出处
《能源与节能》
2013年第7期109-111,共3页
Energy and Energy Conservation
关键词
CCPP
技术分析
经济分析
CCPP
technical analysis
economic analysis