期刊文献+

装配式剪力墙水平拼缝钢筋浆锚搭接抗震性能试验 被引量:71

Test on seismic performance of precast shear wall with reinforcements grouted in holes and spliced indirectly in horizontal connections
下载PDF
导出
摘要 为综合评价水平拼缝采用竖向钢筋浆锚搭接的装配式混凝土剪力墙抗震性能,采用2个装配式和1个现浇的足尺试件进行低周反复荷载试验.试验结果表明:对于破坏形态,装配式混凝土剪力墙内墙试件与现浇试件基本相同,装配式混凝土剪力墙外墙试件与现浇试件有区别;各试件的滞回曲线均较饱满,骨架曲线走势基本一致,耗能能力接近;各试件极限位移角1/56~1/49,位移延性系数均为4;装配式混凝土剪力墙试件较现浇试件初期刚度有所降低,外墙试件水平拼缝上移后,承载能力有所提高. To comprehensively evaluate the seismic performance of precast concrete shear wall with vertical reinforcements grouted in holes and spliced indirectly in horizontal connections,two fabricated and a cast-in-place concrete shear wall with full scale specimens were tested under low cyclic loading.The test results show that the concrete interior shear wall specimens(JN) is basically the same as the cast-in-place specimen(XJ) in failure modes,but the concrete exterior shear wall specimen wall(JW) is different with the XJ.The hysteresis curve of the specimen is full,the trend of the skeleton curve is basically the same and the capacity of the energy dissipation is close.The ultimate displacement angle of each specimen is 1/56-1/49 and the displacement ductility factor are 4.The initial stiffness of JW,JN are lower than the XJ,and the force behavior is improved in exterior wall specimens(JW) with the setting position of horizontal connections moved up.
出处 《哈尔滨工业大学学报》 EI CAS CSCD 北大核心 2013年第6期83-89,共7页 Journal of Harbin Institute of Technology
基金 "十二五"国家科技支撑计划项目(2011BAJ10B03):装配式建筑混凝土剪力墙结构关键技术研究
关键词 装配式剪力墙 水平拼缝 浆锚搭接 抗震性能 precast shear wall horizontal connections grouted and splicing seismic performance
  • 相关文献

参考文献7

二级参考文献40

  • 1梁桂保,张友志.浅谈我国装配式住宅的发展进程[J].重庆工学院学报,2006,20(9):50-52. 被引量:49
  • 2孙巍巍,孟少平.后张无粘结预应力装配混凝土联肢抗震墙的连梁组合体抗侧性能[J].东南大学学报(自然科学版),2007,37(2):190-194. 被引量:12
  • 3JGJl01-96建筑抗震试验方法规程[S].北京:中国建筑工业出版社,1997.
  • 4GB50011-2010建筑抗震设计规范[S].北京:中国建筑工业出版社,2010.
  • 5JG儿01-96建筑抗震试验方法规程[s].北京:中国建筑工业出版社,1996.
  • 6YERLICI V A, TURAN O. Factors affecting anchorage bond strength in high -performance concrete [ J]. ACI Structural Journal, 2000,97 (3) :499 - 507.
  • 7ENRICO S, SUCHART L. Responses of reinforced concrete members including bond - slip effects[J].ACI Structural Journal, 2000, 97 (6) : 831 - 839.
  • 8ALMEIDA de F, MENEZES F,DEBS E, et al. Bond - slip behavior of self - compacting concrete and vi- brated concrete using pull - out and beam tests [ J ]. Materials and Structures/Materiaux et Constructions, 2008, 41 (6) : 1073 - 1089.
  • 9WILSON J L, ROBINSON A J, BALENDRA T. Performance of precast concrete load - bearing panel structures in regions of low to moderate seismicity [ J]. Engineering Structures, 2008,30 (7) : 1831 - 1842.
  • 10KURAMA Y C. Precast/prestressed concrete structures under natural and human - made hazards: special issue [ J ]. Journal of Structural Engineering, 2007,133 ( 11 ) : 1487 - 1488.

共引文献497

同被引文献523

引证文献71

二级引证文献428

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部