摘要 简述福岛核事故后国际上针对多机组事故应急准备和响应的人员扩展要求,基于事故典型多机组应急状态和我国核电厂应急工作实际,提出应对多机组核事故应急响应的人员扩展要求和实现方法。 A brief outline is given on internationally unified requirements of emergency response staffing to Multi-unit events of nuclear power plant after the Fukushima nuclear accident. According to the reality of China's nuclear power plants, expanded emergency response capability for responding to Multi-unit events has been discussed, based on the typical emergency state of Multi-unit events.
出处 《核安全》 2013年第1期36-41,54,共7页 Nuclear Safety
关键词 多机组事故 应急 响应人员 扩展 Multi-unit event emergency response staffing expanded
  • 相关文献

参考文献8

  • 1TEPCO. Effects of the Earthquake and Tsunami on the Fukushima Daiichi and Daini Nuclear Power Stations[J].2011.
  • 2NISA. The 2011 off the Pacific Coast of Tohoku Pacific Earthquake and the Seismic Damage to the NPPs[J].2011.
  • 3IAEA. International Fact Finding Expert Mission of the Nuclear Accident Following the Great East Japan Earthquake and Tusunami:Preliminary Summary[M].Tokyo,Fukushima Daiichi NPP,Fukushima Daini NPP and Tokai NPP,Japan,2011.
  • 4Japan. Report of Japanese Government to the IAEA Ministerial Conference on Nuclear Safety-The Accident at TEPCO's Fukushima Nuclear Power Stations[R].2011.
  • 5U.S.NRC. Recommendations for Enhancing Reactor Safety in the 21 st Century,SECY-11-0093[R].2011.
  • 6U.S.NRC. Prioritization of Recommended Actions to be Taken in Response to Fukushima Lessons Learned,SECY-11-0137[R].2011.
  • 7U.S.NRC. Proposed Orders and Requests for Information in Response to Lessons Learned from Japan' s March 11,2011,Great Tohoku Earthquake and Tsunami,SECY-12-0025[R].2012.
  • 8Assessment of On-shift Emergency Response Organization Staffing and Capabilities. NEI-10-05.Draft Revision0[M].2011.

同被引文献2

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部