摘要
以河南华润电力古城有限公司300MW机组为例,对6kVⅠB段母线失电事故的原因进行了分析,提出了具体的防范措施,供相关人员参考。
Taking the 300 MW unit of China Resources(Henan) Power Gucheng Company Limited as example,the reasons of power failure accidents on 6 kV bus IB segment were analyzed.Some concrete preventive measures were put forward,which provides reference for related personnel.
出处
《华电技术》
CAS
2013年第6期54-55,87,共2页
HUADIAN TECHNOLOGY
关键词
母线失电
高压电机
接地
保护
防范措施
bus power failure
high-voltage motor
grounding
protection
preventive measure