期刊文献+

高新装备复合式预防性保修风险模型

Research on Risk Model for New Equipment with Compound Preventive Warranty
下载PDF
导出
摘要 结合高新装备保修需求,引入复合式预防性保修策略,以"定期更换周期内辅以功能检测"这种典型复合维修工作为例,从安全性影响的角度分析了装备的故障发生情况,并建立了其故障风险数学模型。在此基础上,通过算例给出了所建模型的应用方法,研究了该策略下决策变量对故障风险的影响,并分析了模型的通用性。 Combing with the warranty requirement of high technic and new type equipment ,the compound preventive warranty policy was adopted. Taking the compound maintenance task of periodic replacement with functional checks as example, the risk analysis was carried on, and the warranty risk mathematical model was established. On the basis of above research, a numerical example was given to illustrate the application method and generality of the warranty risk model.
出处 《火力与指挥控制》 CSCD 北大核心 2013年第6期44-47,共4页 Fire Control & Command Control
基金 军队"十二五"预研基金资助项目(51327020304)
关键词 复合维修 预防性保修 风险模型 潜在故障 compound maintenance, preventive warranty, risk model, potential failure
  • 相关文献

参考文献15

  • 1中国人民解放军总装备部.GJB5711-2006装备质量问题处理通用要求[S].北京:中国人民解放军总装备部,2006.
  • 2曾和武,娄寿春.大型武器系统复合维修方式辅助决策模型研究[J].弹箭与制导学报,2002,22(S1):205-207. 被引量:1
  • 3Berke T M,Zaino N A. Warranties: What are They What do They Really Cost[ C ]//Prodeedings of Annual Reliability and Maintainability Symposium, 1991.
  • 4Warranty Guidebook [ M ].Defense System Management College Fort Belvoir, Virginia, 1992,10.
  • 5Kruvand D H. Army Aviation Warranty Concepts[C]//Proceedings of Annum Reliability and Maintainability Symposium, 1987:392-394.
  • 6Vintr Z, Vintr M. After-sales Management of Product War- ranty [C]//Proceedings of IEEE International Engineering Management Conference, 2004:1-10.
  • 7Vintr Z, Vintr M. Modeling Warranty Cost Based on Assessment of Product Components Reliability[ C ]//European Safety and Reliability Conference, 2006:2383-2388.
  • 8Vintr Z, Vintr M. Cost of Two-dimensional Warranty[ C ]//European Safety and Reliability Conference, 2006:2377-2382.
  • 9谢晶.保修策略下的成本与保修期研究[D].天津:天津大学,2005.
  • 10胡飞,宗群.基于产品保修的不可靠生产系统最优生产周期[J].系统工程与电子技术,2009,31(2):479-483. 被引量:3

二级参考文献43

  • 1赵建华,赵建民,赵丽琴.多部件系统故障预防工作的组合优化[J].数学的实践与认识,2005,35(6):182-188. 被引量:5
  • 2蔡景,左洪福,刘明,耿端阳.复杂系统成组维修策略优化模型研究[J].应用科学学报,2006,24(5):533-537. 被引量:34
  • 3Groenevelt H, Pintelon L, Seidmarm A. Production lot sizing with machine breakdown[J]. Management Science, 1992, 38(1) :104 - 123.
  • 4Giri B C, Dohi T. Exact formulation of stochastic EMQ model for an unreliable production system[J]. Journal of the Operational Research Society, 2005, 56(5) : 563 - 75.
  • 5Boukas E K, Liu Z K. Manufacturing systems with random breakdowns and deteriorating items[J]. Automatica, 2001, 37(3): 401-408.
  • 6Rosenblatt W J, Lee H L. Economic production cycles with imperfect production processes [J]. IIIE T-ransaction, 1986, 18(1): 48-55.
  • 7Lee H L, Rosenblatt M J. Simultaneous determin-ation of production cycle and inspection schedules in a production system [J]. Management Sciences, 1987, 33(9) : 1125 - 1136.
  • 8Singa W C, Ting C K, Chiu Y S P. Optimal production lot sizing with rework, scrap rate, and service level eonstraint[J]. Mathematicaland Corn-puterModelling, 2007, 46(3-4) : 535-549.
  • 9Blischke W R, Murthy D N P. Warranty cost analysis[M]. New York : Marcel Dekker , 1994.
  • 10Jack N, Murthy D N P, Iskandar B P. Comments on "maintenance policies with two-dimensional warranty"[J]. Reliability Engineering and System Safety, 2003, 82(1) : 105 - 109.

共引文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部