汾西煤矿35kV变电站接地改造分析 被引量:7

Analysis of Grounding Grid Reconstruction of 35 kV Coal-mine Substation in Fenxi
原文传递
导出
摘要 通过对汾西某煤矿35 kV变电所雷害事故进行仔细分析,其主要原因是地网接地电阻超标、均压不完善、以及冲击接地阻抗过高等。经过现场试验、以及结合现场实际情况并且充分考虑煤矿供电特殊性,决定采用铺设冲击接地均压环降低冲击接地阻抗及改善电位分布,利用自然接地体以及敷设GPF-94高效膨润土降阻防腐剂来达到降阻、防腐的目的。改造之后,通过试验论证,各项接地参数均符合要求,达到预期改造效果。 Through careful analysis on lightning disturbance ox a coat-mine 35 Kv suustation in Fenxi, the main reason is that both of the grounding resistance and the impulse grounding impedance are too high. Field test was carried out and the actual situation is combined with the particularity of power supply in coal-mine, the shielding ring is used to decrease the impulse grounding impedance and to improve the potential distribution. Meanwhile, the grounding resistance is decreased by natural grounding conductors and GPF-94 efficient betonies' reduction in resistance preservatives. After reconstruction, the grounding parameters are in line with requirements.
出处 《电瓷避雷器》 CAS 北大核心 2013年第3期61-65,共5页 Insulators and Surge Arresters
关键词 煤矿变电所 冲击接地优化 自然接地体 冲击均压环 substation in coal-mine optimization oi impulsive grounding natural groundingconductor impulse shielding ring
  • 相关文献

参考文献13

二级参考文献55

共引文献123

同被引文献50

引证文献7

二级引证文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部