摘要
卫生填埋是现阶段垃圾处理必不可少的的最终处理手段。本文结合具体工程就湿陷性黄土山区准好氧垃圾填埋场库区开挖锚固、防渗系统、渗沥液收集导排系统、气体收集处理系统等提出了一系列施工方法,可为其它同类型工程的施工提供借鉴作用。
Healthy landfill belongs to the absolutely necessary final solution method of garbage disposal. In this essay, the author give one series building methods of excavating and anchoring, seepage control system, the Leachate collection-diversion system, and the Gas collection and processing system in the Quasi Aerobic Living Refuse Landfill site reservoirs which locate in collapsed loess mountainous regions, which may provide some references to the same kind construction project.
出处
《工程质量》
2013年第7期60-62,共3页
Construction Quality
关键词
垃圾填埋场
库区开挖锚固
防渗
渗沥液导排
气体收集
The refuse landfill sites
the excavation and anchoring in the reservoir
seepage prevention
the Leachate collectiondiversion system
the gas collection