摘要
针对工程中普遍采用后浇带处理措施 ,探讨了设置后浇带的利弊 ,介绍了处理后浇带的一个工程实例 。
In the view of the treatment measure of post cast strip widely used in projects,this paper discuses the advantages and disadvantages of setting post cast strip,introduces an actual application example of treating post cast strip,which may be a good reference to similar projects.
出处
《石家庄铁道学院学报》
2000年第2期85-87,共3页
Journal of Shijiazhuang Railway Institute
关键词
后浇带
沉降
收缩
施工
post cast strip subsidence contract