摘要
文章对松花江流域规划编制过程中涉及的北水南调工程的定位、流域水资源配置、灌溉发展思路、如何处理发展与保护的关系、调整丰满水电站任务等重大问题进行了分析和探讨。
The paper analyzes and discusses the important problems during the compilation process of comprehensive planning of Songhuajiang river basin,the problems include the location of North-to-South water transfer project,basin water resources allocation,the irrigation development ideas,the relationship treatment between development and conservation,the task adjustment of Fengman hydropower stations,and so on.
出处
《东北水利水电》
2013年第7期21-24,74,共4页
Water Resources & Hydropower of Northeast China
关键词
重大水利问题
认识和体会
松花江流域
important water problems
cognition and experience
Songhuajiang river basin