3Osnat gillor, Ora hadas, Anton F, et al. Phosphorus and nitrogen in a mon omictic freshwater lake: employing cyanobacterial bioreporters to gain new insights into nutrient bioavailability [J ].Freshwater Biology, 2010, 55:1182-1190.
4Kuenen J C, Roberstson L A. Combined nitrification-denitrification process [J]. FEMS Microbiol Rev,1994,1(2):109-117.
5Kuba T, van Loosdrecht M C M, Heijnen J J. Phosphorus and nitrogen removal with minimal COD requirement by integra tion of nitrification in a two-sludge system [J ]. Water Res. , 1996,42( 1/2): 1702-1710.
6中国市政工程华北设计研究院.泰安市污水处理实验研究报告[R].天津,1989:15-32.
7Wanner J.,Cech J.S.,kos M.. New process design for biological nutrient removal [J ].Wat.Sci.Tech,1992,25(4-5 ):225-228.
8M. Shimura and T. Tabuehi, The effect of livestock on the eoneen-tration of nitrogen in stream water, Water Science and Technology,1994, 30(7) : 167-170.
9K. Sundblad, A. Tonderski and J. Rulewski, Nitrogen and phos-phorus in the Vistula fiver, Poland-changes from source to mouth,Water Science and Technology, 1994, 30(5) : 177- 186.
10P.G. Piekema and S.B. Gaastra, Upgrading of a wastewater treat-ment plant in the Netherlands: combination of several nutrient re-moval processes, European Water Pollution Contrd, 1993, 3(3):21-26.