摘要
对山西瑞光热电一期双进双出磨煤机出现的煤粉管堵塞现象进行了故障判定和原因分析,介绍了采取的对应措施,确保了机组安全稳定运行。
This paper analyses the causes of coal powder tube blockage of the double inlet and double outlet coal pulverizer of the first-stage of Shanxi Ruiguang Thermal Power Plant, and introduces the corresponding measures to ensure the safe and stable operation of the unit.
出处
《电力学报》
2013年第3期241-243,共3页
Journal of Electric Power
关键词
双进双出磨煤机
煤粉管
堵塞
分析
措施
double inlet and double outlet coal pulverizer
coal powder tube
blockage
analysis
measure