摘要
介绍了慈林医院地上大面积停车场的设计与施工过程。考虑到建筑的主入口位于建筑的2层,南侧停车场采用现浇钢筋混凝土框架体系,东侧停车场采用地上大面积堆土的形式。重点描述了大面积堆土停车场设计过程中遇到的问题和解决的办法。通过综合技术措施,控制和减小了大面积堆土停车场在施工过程中对主体结构和周边环境造成的影响。
The design and construction of large overground car park of Cilin hospital was introduced.Considering that the building′s main entrance is on the second floor,RC frame system is used in the south car park,while east car park takes the form of large soil heaping on the ground.Solutions to the problems in the design of east car park were highlighted.Through comprehensive technical measures,the impact of construction of east car park on the main structure and environment around was controlled and reduced.
出处
《建筑结构》
CSCD
北大核心
2013年第12期25-28,共4页
Building Structure
基金
上海市青年科技启明星计划项目(11QB1403200)
上海建筑设计研究院青年科研基金项目(院青-11-1类-0056-结)
关键词
设计与施工
大面积堆土
停车场
综合技术措施
design and construction
large soil heaping
car park
comprehensive technical measure