马鞍山长江公路大桥钢塔柱水平预拼装施工技术 被引量:7

THE CONSTRUCTION TECHNOLOGY OF LEVEL PRE-ASSEMBLY FOR STEEL TOWER OF MAANSHAN YANGTZE RIVER BRIDGE
下载PDF
导出
摘要 通过介绍马鞍山长江公路大桥钢塔柱水平预拼装施工工艺流程,重点提出钢塔柱水平预拼装关键工艺和质量控制、检测方法等技术。这些技术的成功运用,较好地消除和解决钢塔柱制作累计误差;通过良好的水平预拼装效果,保证了桥位安装精度,取得显著的经济效益和社会效益,可为今后类似大型桥梁钢塔水平预拼装施工提供参考。 This paper gives a brief introduction to the construction procedure of level pre-assembly for the steel towers of Maanshan Yangtze River Bridge. It points out the key technologies such as process control, quality control and inspection methods for the level pre-assembly of steel towers. The successful application of these technologies eliminates the accumulated error of steel tower fabrication. The good effect of level pre-assembly guarantees the erection effect at site and achieves remarkable economic and social benefits, which provides references for level pre assembly construction for steel towers of similar large bridge in the future.
出处 《钢结构》 2013年第6期68-72,共5页 Steel Construction
关键词 马鞍山长江公路大桥 钢塔柱 水平预拼装 检测方法 Maanshan Yangtze River Bridge steel tower level pre-assembly inspection method
  • 相关文献

参考文献10

二级参考文献8

共引文献25

同被引文献54

引证文献7

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部