辅机故障快速减负荷调试方案的改进及应用 被引量:2

Improvement and Application of Commissioning Plan for Auxiliary Equipment Failure Run Back
下载PDF
导出
摘要 介绍了国内超(超)临界直流机组辅机故障快速减负荷的试验方法,通过更为合理的机组快速减负荷(RB)功能试验逻辑的设计改进和试验的有效组织,使超(超)临界机组RB功能试验更为安全,试验的质量控制更加严格,现场使用更加可靠,降低机组因RB实际动作时意外跳闸的可能性,形成一套科学的、完整的、系统的RB功能试验方法,为今后基建阶段超(超)临界机组的RB功能试验提供调试经验。 A commissioning method for auxiliary equipment failure run.back (RB) in ultra-supercritical unit is introduced. With the improvement design of the RB control logic and effective organization of RB test, it makes the ultra-supercritical unit RB test more safe, test quality control more strictly and the RB function application more reliable. The probability of unit accidental trip when RB happens is reduced. A set of scientific and systematic RB commission method is formed, which can provide reference of RB test for ultra-supercritical unit during construction period.
作者 陆梁
出处 《电力与能源》 2013年第3期254-258,共5页 Power & Energy
关键词 超临界机组 辅机故障 快速减负荷 调试方案 Ultra-supercritical unit Auxiliary equipment failure Run back Commissioning plan
  • 相关文献

参考文献2

二级参考文献1

  • 1党黎军,赵志丹,王乐毕.大型循环流化床机组的控制保护技术及应用[M].北京:中国电力出版社,2008:1-5.

共引文献42

同被引文献13

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部