摘要
采用多目标决策方法 ,通过对影响火电基建项目开工排序的电力电量平衡、上网电价及环境保护等因素的分析 ,探讨若干项目开工排序问题 ,以期为投资决策提供一些参考。
In this paper, writer try to use multi-aim decision method, by analyzing effective of electric power load balance and power capability balance, supplying electric-network power price and environmental protection on power plants capital construction commencing order arrangement, to discuss problems of these projects commencing order arrangement, it would like to provide a reference idea of make-decision for owners.
出处
《江西电力》
2000年第3期37-40,共4页
Jiangxi Electric Power
关键词
火力基本建设项目
开工排序决策
电力工业
thermal plant
capital construction
commencing order arrangement
decision
discussion